Educational Facility Projects

Picture of Mill Creek School

Seattle School District Hamilton International Middle School, Seattle, WA
July 2008 - present

$43 million modernization of three-story, 127,000 square foot historic school. Updates expand capacity to 1,000 students and include a 300-seat auditorium, new gymnasium and lobby, 45-car covered parking garage, technology lab, and a pedestrian connection to Wallingford Park. Inspections include reinforced concrete, epoxy grouted anchors, reinforcing steel, shotcrete, masonry, structural steel, welding, fiber-reinforced polymer and lateral framing.

Picture of Mill Creek School

Lynnwood High School, Bothell, WA
Completed: August 2009

New $68 million, two-story, 214,000 square foot school building designed to accommodate 1,600 students and 100 staff. Inspections include reinforced concrete, masonry, epoxy grouted anchors, baseplate grout, structural steel fabrication and erection, ultrasonic testing, fireproofing, seismic resistive systems, asphalt compaction and load testing.

Hillsboro SD South Meadows Middle School, Hillsboro, OR
Completed: April 2009

New 154,000 square foot middle school. Two-story structure replaces old school on the project site. Inspections include reinforced concrete, nonshrink grout, baseplate grout, proprietary anchors, masonry, seismic resistance, structural steel fabrication and erection as well as ultrasonic testing.

Sherwood SD Sherwood Elementary/Middle School, Sherwood, OR
Completed: July 2009

New $36 million elementary and middle school totaling 147,000 square foot. Inspections include reinforced concrete, baseplate grout, proprietary anchors, masonry, asphalt density, intumescent paint, structural steel fabrication and erection. Special testing includes floor flatness, slab moisture emissions and ultrasonic testing.

Picture of Mill Creek School

New Primary School, University Place, WA
Completed: August 2008

New $14.5 million, 55,579 square foot, three-story elementary school with classrooms, administrative office, cafeteria, and gymnasium. Inspections include soil compaction, reinforced concrete, baseplate grout, epoxy grouted and expansion anchors, structural steel fabrication and erection, lateral framing, seismic resistive components and asphalt compaction.

Picture of Mill Creek School

Mill Creek School, Kent, WA
Completed: February 2008

$18 million phased project includes a two-building addition and modernization of five existing school buildings. Inspections include reinforced concrete, baseplate grout, epoxy grouted anchors, expansion anchors, masonry, structural steel erection and fabrication, lateral wood framing, asphalt coring and density.

Picture of Mount Rainier High School

Mount Rainier High School, Des Moines, WA
Completed: August 2007

New $40.6 million, 205,000 square foot high school with administrative offices, classrooms, cafeteria, gymnasium and library. Inspections include soils compaction, reinforced concrete, masonry, structural steel erection, fireproofing and moisture testing.

Picture of Roosevelt High School

Roosevelt High School, Seattle, WA
Completed: August 2006

$84.5 million, project consisting of the demolition of the current gymnasium, cafeteria and shop; renovation of the historic 1922 and 1928 buildings; and an addition to the north side of the building to house a new gym, cafeteria and performing arts center. Inspections include soil density, reinforced concrete, shotcrete, expansion anchors, epoxy dowels, masonry, structural steel fabrication, epoxy dowel load testing, structural steel erection, fireproofing and asphalt density.