Educational Facility Projects

Picture of Mill Creek School

Mill Creek School, Kent, WA
Completed: February 2008

$18 million phased project includes a two-building addition and modernization of five existing school buildings. Inspections include reinforced concrete, baseplate grout, epoxy grouted anchors, expansion anchors, masonry, structural steel erection and fabrication, lateral wood framing, asphalt coring and density.

Picture of Cavelero Middle-High School

Cavelero Middle-High School, Lake Stevens, WA
Completed: August 2007

New 220,000 square foot, two-story middle-high school to accommodate 1,500 students. Inspections include soil compaction, reinforced concrete, epoxy grouted anchors, expansion anchors, non-shrink grout, structural steel fabrication and erection, ultrasonic testing, seismic resistance systems, fireproofing and asphalt density.

Picture of Mount Rainier High School

Mount Rainier High School, Des Moines, WA
Completed: August 2007

New $40.6 million, 205,000 square foot high school with administrative offices, classrooms, cafeteria, gymnasium and library. Inspections include soils compaction, reinforced concrete, masonry, structural steel erection, fireproofing and moisture testing.

Picture of Medina Elementary School

Medina Elementary School, Medina, WA
Completed: December 2006

$14.5 million demolition and replacement of existing school. Inspections include reinforced concrete, expansion anchors, masonry, structural steel fabrication and erection and lateral framing.

Picture of Roosevelt High School

Roosevelt High School, Seattle, WA
Completed: August 2006

$84.5 million, project consisting of the demolition of the current gymnasium, cafeteria and shop; renovation of the historic 1922 and 1928 buildings; and an addition to the north side of the building to house a new gym, cafeteria and performing arts center. Inspections include soil density, reinforced concrete, shotcrete, expansion anchors, epoxy dowels, masonry, structural steel fabrication, epoxy dowel load testing, structural steel erection, fireproofing and asphalt density.

Picture of Kelso High School

Kelso High School, Kelso, WA
Completed: August 2004

$33 million modernization and classroom addition on existing high school. Inspections include reinforced concrete, structural masonry,structural steel welding, ultrasonic testing, shear tests, nailing, epoxy bolts and asphalt density.