Commercial

Intel Ronler Acres MSB

This $6 billion project includes 2.5 million square foot campus expansion anchored by a 1 million square foot research factory called D1X Mod 2, office building, manufacturing support building, and additional parking garage. Inspections include reinforced concrete, structural steel, fireproofing, proprietary anchors, asphalt, and floor flatness testing.

Rufus 2.0

The $300 million project includes three phases. Phase 1 (Block 14) includes a 37-story office building and a separate multi-purpose meeting facility.  Phase 2 (Block 19) includes a 38-story office building and a 5-story office building.  Phase 3 (Block 20) includes a 38-story office building and an 8-story office building. Inspections include reinforced concrete, batch plant, shotcrete, shoring, fireproofing and structural steel fabrication and erection a

Daimler Trucking Headquarters Expansion

This project $150 million project consists of a 265,000 square-foot building. The project also includes opening a greenway trail along the Willamette River and construction of a parking garage. Testing and Inspections Include reinforced concrete, structural steel and proprietary anchors.

Snoqualmie Tribe Casino

This $130 million project consisted of a 185,000-square-foot two-level casino with seven restaurants, bars, a multi-purpose room and back of house support areas. Adjacent to and below the casino is a six-level, 300,000-square-foot, cast-in-place concrete parking structure that holds 990 cars. This project received a Top Projects in Hospitality nod from Northwest Construction magazine. Inspections included reinforced concrete, post tension concrete, shotcrete, mason

Gates Foundation Campus and Parking Garage

The Gates Foundation project consists of a new $500 million facility constructed in two phases on a 12-acre campus. With the completion of Phase 1, the campus includes two six-story buildings, totaling 900,000 square feet with 400 stalls of underground parking, and an 11,000-square-foot visitor’s center. This project also includes a two-acre, 1,020-stall, five-story underground parking garage, totaling 356,390-square-feet, built across Fifth Avenue in collabo

Boeing Everett Fuel Farm and Flight Line Utilities

This $80 million project included a new fuel depot, aircraft maintenance stalls and taxiways.  Construction added three new 130,000-gallon fuel tanks and 4,000 feet of fuel piping, as well as 18 new aircraft maintenance stalls measuring 88,000 square feet each.  The project required more than 50,000 yards of concrete and the backfilling of more than 20,000 yards of material.  Inspections included soils compaction, reinforced concrete, concrete paving

Lincoln Square

This multiphased, $510 million project consisted of a 650,000-square-foot, 25-story office tower with five levels of below-grade parking plus a 42-story condominium/hotel mixed-use building. The mixed use building has more than 450,000 square feet of hotel and condo space with 148 condos and 303 hotel rooms, a 330,000-square-foot retail podium and nine levels of below-grade parking with 2,100 stalls. Inspections included soil nailing, reinforced concrete, post tens

Microsoft West Campus Expansion

This campus expansion project included the construction of five new buildings including 94, 95, 96, 97 and 98, as well as a parking garage and storm vaults, totaling 1.3 million square feet on 43 acres at the Microsoft corporate headquarters. Inspections included soils compaction, reinforced concrete, post tension concrete, epoxy grouted anchors, expansion anchors, masonry, structural steel fabrication and erection, ultrasonic testing and fireproofing.

Pike Place Market Renovation Phases 1 & 2

The $68 million, four-phase renovation to a historic Seattle landmark includes structural upgrades, new public restrooms, new elevators and a remodel of retail spaces. The first phase included a new central mechanical plant and upgrades to the hill climb, Leland Building and Fairley Building. Phase 2 targets the Triangle Market, Sanitary Market, Corner Market, and First and Pine Building. Both Phases 1 and 2 include lateral improvements and seismic upgrades through

Capital Mall Expansion

This $19 million mall expansion included three new one-story retail buildings totaling 75,000 square feet as well as a new 14-screen movie theater with stadium seating. The expansion buildings feature an exterior facade of glass curtain wall, CMU and metal siding and 3,068 parking spaces were added as part of the project.  Testing and inspections included soils, reinforced concrete, masonry, structural steel fabrication and erection, baseplate grout, epoxy and

Cascade Station Retail Center

This project located near the Portland International Airport consisted of two tilt-up buildings and four shop buildings totaling 335,000 square feet. This retail center spans 27 acres of site work and features retailers such as Sports Authority, Best Buy, Staples, Famous Footwear and Marshalls.  Inspections included reinforced concrete, epoxy grouted anchors, and structural steel fabrication and erection.