Boeing Everett Fuel Farm and Flight Line Utilities

Category Commercial
Location Everett, WA
Owner Boeing Commercial Airplane Group

This $80 million project included a new fuel depot, aircraft maintenance stalls and taxiways.  Construction added three new 130,000-gallon fuel tanks and 4,000 feet of fuel piping, as well as 18 new aircraft maintenance stalls measuring 88,000 square feet each.  The project required more than 50,000 yards of concrete and the backfilling of more than 20,000 yards of material.  Inspections included soils compaction, reinforced concrete, concrete paving, epoxy grouted anchors, expansion anchors, fuel tank welding and pipe welding.